Spatial coordination
The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments.
However, there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages actually include, and so it is important that appointment documents make it clear specifically what activities fall within which stage, and what level of detail is required.
‘Spatial coordination’ is a new stage introduced by the RIBA Plan of work 2020. This replaces ‘developed design’ in the 2013 edition and might previously have been known as ‘detailed design’.
The RIBA Plan of Work is published by the Royal Institute of British Architects (RIBA). Split into a number of key project stages, the RIBA Plan of Work provides a shared framework for design and construction that offers both a process map and a management tool.
The RIBA Plan of Work 2020 changed the structure of the stages as shown below:
Stage | 2013 edition | 2020 edition |
0 | Strategic definition. | Strategic definition. |
1 | Preparation and brief. | Preparation and briefing. |
2 | Concept design. | Concept design. |
3 | Developed design. | Spatial coordination. |
4 | Technical design. | Technical design. |
5 | Construction. | Manufacturing and construction. |
6 | Handover and close out. | Handover. |
7 | In use. | Use. |
The 2020 edition of the RIBA Plan of Work suggests that the spatial coordination stage: ‘...is fundamentally about testing and validating the Architectural Concept, to make sure that the architectural and engineering information prepared at Stage 2 is Spatially Coordinated before the detailed information required to manufacture and construct the building is produced at Stage 4… Stage 3 is not about adjusting the Architectural Concept, which should remain substantially unaltered, although detailed design or engineering tasks may require adjustments to make sure that the building is Spatially Coordinated.’
It suggests that a spatially coordinated design is a: 'Design in which the client’s Spatial Requirements and the spaces required for any Building Systems – such as structural and building services engineering aspects, including grids, risers and plant rooms – have been determined and fixed to allow Stage 4 to progress without any further iterations.'
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
About the 5 Percent Club and its members
The 5% Club; a dynamic movement of employers committed to building and developing the workforce.
New Homes in New Ways at the Building Centre
Accelerating the supply of new homes with MMC.
Quality Planning for Micro and Small to Medium Sized Enterprises
A CIOB Academy Technical Information sheet.
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.